|
|
|
|
Home Contact Us ACCESS ASHEVILLE ACCOMMODATIONS ACTIVISTS ADVERTISERS ADVISORIES ARCHIVES ARTS & CULTURE ATTRACTIONS BLOGS BUSINESS COMMENTARY CRIME & JUSTICE DEVELOPMENT DINING ENTERTAINMENT EDUCATION ENVIRONMENT EVENTS GOVERNMENT HEALTH CARE HISTORY HUMOR LINKS MAPS MEDIA MUSIC NEWS NON-PROFITS ON STAGE OPINION PHOTOS POLITICS SHOPPING STREETS VIDEOS WEIRD |
New Science & MultiMedia Building UNC Asheville Breaks Ground for Signature Science and Multimedia Building; Largest of the Bond-Funded Projects Gets Under Way This Fall
UNC Asheville broke ground this morning for the Steve and Frosene Zeis Science and Multimedia Building, an 88,500-square-foot structure that will be the new home for the departments of Chemistry, Biology and Multimedia Arts and Sciences. The statewide Higher Education Improvement Bond Referendum of 2000 has provided $22.2 million for the $24-million project. Construction is scheduled to begin this fall and be completed in spring 2007. “We are at a critical juncture in our collective dream to provide state-of-the-art science and multimedia experiences for our campus community. It is at this point where our dream is about to develop an actual physical presence in our midst, on our campus. It begins with the first shovelful of earth that will be dug today,” said Chancellor Anne Ponder at the ceremony, which was attended by some 250 people. The Steve and Frosene Zeis Science and Multimedia Building will be sited on an existing parking lot in the academic core of the campus. It will have 44 teaching and research labs, two multimedia lab classrooms, a computer lab, seminar rooms, a large classroom and 36 offices. Environmentally friendly design aspects include advanced storm water management, low-emitting interior materials, water efficient landscaping, and significant use of natural light throughout the structure. The new building will see significant use. Each semester, about 1,700 students are enrolled in some 100 classes taught by the three departments. The building was named by the UNC Asheville Board of Trustees in honor of Steve and Frosene Zeis, longtime friends of the University who recently presented a $3 million gift to the University, the largest private gift in UNC Asheville’s history.
The location of the building will impact a small portion of the Charles G. Tennent Park; the bulk of the park will remain intact. Over the past year, many plants in the affected area of the park were moved to other campus locations; additional plants will be moved prior to construction. The building site will also eliminate 68 existing parking spaces, but the loss will be offset by a new parking area at the Physical Plant complex, another bond-funded project currently under construction. Public transportation, bicycling facilities and carpooling options are being enhanced. UNC Asheville has received $50.1 million through the 2000 Bond Referendum, which is allowing the University to undertake the largest capital program in its history. The Highsmith University Union, which opened in August 2004, was funded largely through the referendum. A new classroom building to replace the outmoded facilities in Carmichael Hall is under construction and will be completed in November 2005. Renovations to Zageir Hall will begin later this academic year. The new Facilities Management Complex will be completed in December 2006. - News provided by UNCA dauncanewsciencemultimediabldgbb1
|
|